Project Overview - View and Print Print Page Close Window

Chamber Street Station
Chamber Street, NY


Scope of Work:
  • Inspection of Building Structure
  • Preparation of Drawings and Specifications
  • Construction Administration

Owner Contact:
MTA

Engineer(s):

Architect(s):

Job Description:

RO Engineers was contracted to design underpinning for the new station improvements on Chamber Street. The elevator for the new subway construction encroached on the foundations of an adjoining building. RO acted as the contractor’s engineer to prepare the underpinning drawings.